[CS] Kovler Mid Term Geotech Soil Boring Work: 5/18

Carmen Langford clangford1 at uchicago.edu
Tue May 16 12:23:47 CDT 2023


Greetings All,

Please be advised, as part of the Kovler Mid Term renovation, contractors will need to soil bore in three separate locations on the north end of Kovler for a newly installed AHU to be elevated above grade. Below is an aerial view on where the boring will occur. Please note, this area will have barricades in place and the work is scheduled to begin Thursday 5/18 at 8AM and is expected to last the remainder of the day. Periodically, this work will create noise and vibrations as a 200lb weight will be used to pound the bore through the ground.

[cid:image001.png at 01D987F0.1D68D290]


Thanks,

Carmen Langford
Building Manager
Department of Computer Science
5730 S Ellis Ave – Room 248
Chicago, IL 60637
clangford1 at uchicago.edu<mailto:parodriguez at uchicago.edu>
(773)-795-0982
https://cs.uchicago.edu/


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.cs.uchicago.edu/pipermail/cs/attachments/20230516/7008c265/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 669094 bytes
Desc: image001.png
URL: <http://mailman.cs.uchicago.edu/pipermail/cs/attachments/20230516/7008c265/attachment-0001.png>


More information about the cs mailing list